UNDA Technology · Every decision, in context
Every decision on a site has a reason. We index it.
Councils, counties and utilities publish thousands of decisions a year, but the reasons are buried in minutes, reports and dockets. UNDA reads them, links each one to its site, its conditions and what happened next, and turns them into evidence for the people who build, manage and power property.
UNDA Development · real decisions
1804 Cool Spring Dr., Alexandria · carport addition
One request · Mount Vernon, Fairfax County
One request, 15 decisions around it.
In 2025, 1804 Cool Spring Dr. asked to build a carport closer to the side line than the rules allow. Within half a mile, the Board had already decided 15 side-yard cases since 1996: 13 approved, 2 denied.
The ask: 6.0 ft from the line.
An R-3 lot of about 12,036 sq ft. The carport would sit 6.0 ft from the southeast side lot line. Would that be too close?
Where the neighbours landed.
Nearby approvals ran from 3.3 to 10.7 ft, and three were at exactly 6.0 ft. Both denials were carports right at the line: 1.4 ft and 0.2 ft. The 0.2 ft carport was later approved at 6.0 ft.
Approved 6–0, July 2025.
The Board found the carport in keeping with the neighbourhood, with no harm to the adjoining lot, and the minimum reduction needed. Each case turns on its own facts: precedent, not prediction.
Lot lines from Fairfax County parcel data. Buildings are illustrative massing. Distances and reasons from the Board's case records. No names are shown.
Sydney · Waverley and Randwick
Panel decisions, with their reasons.
UNDA reads what each Local Planning Panel was asked, what it decided and why, so you can see how sites like yours have gone before you lodge.
Randwick in numbers →Bondi Junction · seven new dwellings
Fairfax County, Virginia
The side-yard decisions around a lot.
Before 1804 Cool Spring Dr. asked to build a carport 6.0 ft from the line, the Board had already decided 15 side-yard cases nearby. UNDA puts them in front of you before you apply.
How close to the side line? →Guides and samples
Start with the question you have.
The problem
The decision is public. The reasoning is buried.
A register tells you a case was approved. It rarely tells you why, what the board asked for, or how the same request went next door. That context decides how you prepare.
Outcome and date
Case number, address, approved or denied. Useful, but it stops at the result.
Reasons and conditions
The board’s findings, votes and conditions, often in scanned PDFs going back decades.
What happened next
Recorded distances, permit timing and the work that was actually built.
One record, joined by parcel
We connect all three, so every precedent around a site can be read in one place.
How an application moves
Every project passes the same desks. Precedent helps at each one.
Wants to build
A house, an addition, a new building or a change of use.
Prepares the application
Plans, setbacks and the case for any variance or rezoning.
Argues it, where needed
Hearings, appeals and conditions negotiated with the authority.
Decides
Within the rules it’s a permit. Outside them it goes to a board or panel.
Apply with evidence. Bring the board the decisions it has already made on similar sites: what was approved, what was refused, and the conditions it set. Precedent, not prediction.
Products
One public record. A product for each job.
Each product reads the same kind of source, the decisions public bodies publish, and organises it for the people who act on it.
UNDA Development
Planning & permit intelligence
For builders, contractors and land-use attorneys preparing an application: comparable decisions near your site, the conditions boards set, and how long permits took after approval.
- Fairfax
- Prince William
- Loudoun
- Waverley
- Randwick
UNDA Management
Strata market intelligence
For strata managers: who manages which buildings, where new schemes are being registered, and where the market is moving.
- 88,000+ active NSW schemes
- Data as at May 2026
UNDA Power
Data center intelligence
Every rule and decision that shapes where data centers get built and how they get powered, tracked across counties, states and utilities.
- RulesZoning, special exceptions, pauses and moratoria
- PowerLarge-load tariffs and utility decisions
UNDA Works
Trades market intelligence
For HVAC, electrical and plumbing businesses: where installs and replacements are happening in your area, and where demand is growing.
- HVAC
- Electrical
- Plumbing
Where we cover
See every approval. Each condition. Every precedent.
Every county and council joins every plan of its product at no extra cost.
UNDA Development
Fairfax County, Virginia
5,343 Board of Zoning Appeals cases, with the Board’s minutes for Jul 1995–2013 and 2023–26.
Fairfax County in numbersPrince William County and Washington MSA
Rezoning, special use and planning case records.
Prince William in numbersLoudoun County, Virginia
Building permits for new homes and work under way, mapped by location.
Loudoun in numbersCoverage map · Northern Virginia
Every case and permit we index, where it happened.
- Fairfax County · Board of Zoning Appeals cases5,193
- Prince William County · planning cases7,118
- Loudoun County · new-home permits, 2010–202446,666
Records with a location. Each dot totals the records in a square about 2 km across; larger dots hold more. 5,193 of Fairfax’s 5,343 cases carry a location.
Waverley, NSW
11,235 development applications on the council register, with the planning panel's reasons summarised.
Waverley in numbersRandwick, NSW
491 planning panel decisions, with their reasons.
Randwick in numbersNew South Wales strata
Every active strata scheme in the state, with managers consolidated into their corporate groups. Data as at May 2026.
UNDA ManagementCoverage map · New South Wales
Every active strata scheme in the state.
- Active strata schemes with a location87,881
Each dot totals the schemes in a square about 8 km across; larger dots hold more. 87,881 of 88,210 active schemes carry a location. Data as at May 2026.
Data center power and approval rules, worldwide.
We track data center power and approval rules worldwide: 130 decisions across 68 jurisdictions as of October 2026, from Texas and New York to Ireland, Singapore and Korea.
- TexasLarge load interconnection
- New YorkData center permit moratorium
- IrelandConnection offer policy
- SingaporeCapacity allocation
- KoreaAI data center act
The data center tracker is becoming UNDA Power. Join the early-access list
Growing town by town, country by country.
UNDA Newsroom
Stories from the public record.
Short films on the decisions shaping places: what a project costs, who decided and how, who is behind it, and what the community gets.
Book a demo
Preparing an application? Start with what’s already been decided.
Already a customer? Your dashboards open in Evidence. How to log in
